monofrio@westportct.gov, 515 Post Road East, 2nd Floor,
WPCA Approval 1-4-23
Valle said she wants more information about how any new property owner will still keep rents low. Explanatory Statement
Westport, CT 06880 . Monday through Friday -8:00 am to 1:00 PM Permit Applications: Building Permit application submissions: Click here to see which building applications can be filed in-person and which are required to be filed by e-mail. New capabilities will be announced soon, including: Get online guidance on land use projects from the Zoning, Health, Conservation, Public Works, Building and Fire permits. Comments
BNT's proposed 44-unit building would also be located in her East Side district. Floor Plans by Beinfield Architects, rev. Some of the features on CT.gov will not function properly with out javascript enabled.
Comments from the Fire Marshal, 2-21-23
272 Post Road East, Westport, CT 06880 USA As a Realtor, I was committed to providing the highest quality real estate services possible using Berkshire Hathaway's cutting edge marketing services . * & ** SUBMIT A SERVICE REQUEST Resolution, 0 Maple Ave North - Subdivision Appl.
Trip Generation Assessment
Airbnb, VRBO, Booking.com and other short-term renting sites will be prohibited from authorizing bookings for unregistered short-term rentals. DEEP will not be renewing this general permit. 2023 Town of Westport, CT. All Rights Reserved. NOTE: Some browsers do not allow for fillable PDFs ---> Download, Open, Fill in, then Save. Variable base on withdrawal amount. I, THE UNDERSIGNED, hereby affirm and attest that I am familiar with the requirements and provisions of the BUILDING CODE of the STATE of CONNECTICUT and the Ordinances of the TOWN of WESTPORT as they apply to the work described above, and I agree to satisfy those requirements in every portion of t hat work, and to give the applicable local and . Our Permitting Assistant is available to talk you through the process of entering permit applications until you become comfortable with the new system. Notice Letter
Ranging from $100 - $3,000. Permit Fees Requirements for a New House Application/Permit Yard Sale Permits Zoning Map (2015) Cemetery Department Cemetery Fees Cemetery Regulations Research Public and Private Cemeteries Westport Cemetery Gravestone Cleaning, Repairs and Restoration Conservation Commission Beach Ave Plan Conservation Commission Fees Forms & Applications Department Comments
Engineering Comments 01-30-23
1705 0 obj
<>stream
Superseded Materials
Hazardous Waste | Solid Waste | Waste Transportation | Recycling | Marine Terminals | Pesticides, Treatment of waste oil, petroleum or chemical liquids. Questions will be answered during the allotted times above you can always email your questions to pandz@westportct.gov at anytime. Letter from First Selectwoman dated 2-25-23 with attached proposed Fourth Amendment
Residents and contractors can call or email our office during regular business hours at 203-341-5025 to address any questions or concerns. Comments from the Fire Marshal, 2-2-23
Engineering Comments 02-02-23
Superseded Materials
@font-face {font-family:"Cambria Math"; panose-1:2 4 5 3 5 4 6 3 2 4; mso-font-charset:0; mso-generic-font-family:roman; mso-font-pitch:variable; mso-font-signature:-536870145 1107305727 0 0 415 0;}@font-face {font-family:Calibri; panose-1:2 15 5 2 2 2 4 3 2 4; mso-font-charset:0; mso-generic-font-family:swiss; mso-font-pitch:variable; mso-font-signature:-536859905 -1073732485 9 0 511 0;}p.MsoNormal, li.MsoNormal, div.MsoNormal {mso-style-unhide:no; mso-style-qformat:yes; mso-style-parent:""; margin-top:0in; margin-right:0in; margin-bottom:10.0pt; margin-left:8.65pt; line-height:115%; mso-pagination:widow-orphan; font-size:12.0pt; font-family:"Calibri",sans-serif; mso-ascii-font-family:Calibri; mso-ascii-theme-font:minor-latin; mso-fareast-font-family:"Times New Roman"; mso-hansi-font-family:Calibri; mso-hansi-theme-font:minor-latin; mso-bidi-font-family:"Times New Roman";}.MsoChpDefault {mso-style-type:export-only; mso-default-props:yes; font-size:11.0pt; mso-ansi-font-size:11.0pt; mso-bidi-font-size:11.0pt; font-family:"Calibri",sans-serif; mso-ascii-font-family:Calibri; mso-ascii-theme-font:minor-latin; mso-fareast-font-family:Calibri; mso-fareast-theme-font:minor-latin; mso-hansi-font-family:Calibri; mso-hansi-theme-font:minor-latin; mso-bidi-font-family:Arial; mso-bidi-theme-font:minor-bidi;}.MsoPapDefault {mso-style-type:export-only; margin-bottom:8.0pt; line-height:107%;}div.WordSection1 {page:WordSection1;}, Fees: $1,750 (includes $940.00 application fee) hOPyTKp ;8H8,$U7b6LN5Q4QzB|k|#7~!=Q\M[ #PZ-22-0067, 10/24/22 Approval of Text Amend #823 Res. 860.663.1765. Existing Conditions Survey prepared by Landtech, 1-27-23
Electrical Permit Application Plumbing Permit Application Mechanical Permit Application Roofing,Windows,Siding Permit Application Trade Permits A building permit gives you, your insurance company, your neighbors and the town assurance that specific minimum standards are met in constructing, altering, or repairing your home by complying with the Building Code. Topography Survey prepared Redniss & Mead, 01-06-23
Public Act 21-29
8-24 Municipal Improvement Appl. Variable based on acreage. The Building Department is located at 515 Post Road East, on the second floor of the Central Fire Station. Permit Fees Requirements for a New House Application/Permit Yard Sale Permits Zoning Map (2015) Cemetery Department Cemetery Fees Cemetery Regulations Research Public and Private Cemeteries Westport Cemetery Gravestone Cleaning, Repairs and Restoration Conservation Commission Beach Ave Plan Conservation Commission Fees Forms & Applications Comments from Parks and Rec. Application
Proposed Text Change Language 01-19-22
SUPERSEDEDBond Cost Estimate 1-30-2023
Public Notice: 30-day initial notice of application - AND - Notice of Tentative Determination (30 days), Estimated Processing Timeframe: 12 months (6 months for renewal). @font-face {font-family:"Cambria Math"; panose-1:2 4 5 3 5 4 6 3 2 4; mso-font-charset:0; mso-generic-font-family:roman; mso-font-pitch:variable; mso-font-signature:-536870145 1107305727 0 0 415 0;}@font-face {font-family:Calibri; panose-1:2 15 5 2 2 2 4 3 2 4; mso-font-charset:0; mso-generic-font-family:swiss; mso-font-pitch:variable; mso-font-signature:-536859905 -1073732485 9 0 511 0;}p.MsoNormal, li.MsoNormal, div.MsoNormal {mso-style-unhide:no; mso-style-qformat:yes; mso-style-parent:""; margin-top:0in; margin-right:0in; margin-bottom:10.0pt; margin-left:8.65pt; line-height:115%; mso-pagination:widow-orphan; font-size:12.0pt; font-family:"Calibri",sans-serif; mso-ascii-font-family:Calibri; mso-ascii-theme-font:minor-latin; mso-fareast-font-family:"Times New Roman"; mso-hansi-font-family:Calibri; mso-hansi-theme-font:minor-latin; mso-bidi-font-family:"Times New Roman";}.MsoChpDefault {mso-style-type:export-only; mso-default-props:yes; font-size:11.0pt; mso-ansi-font-size:11.0pt; mso-bidi-font-size:11.0pt; font-family:"Calibri",sans-serif; mso-ascii-font-family:Calibri; mso-ascii-theme-font:minor-latin; mso-fareast-font-family:Calibri; mso-fareast-theme-font:minor-latin; mso-hansi-font-family:Calibri; mso-hansi-theme-font:minor-latin; mso-bidi-font-family:Arial; mso-bidi-theme-font:minor-bidi;}.MsoPapDefault {mso-style-type:export-only; margin-bottom:8.0pt; line-height:107%;}div.WordSection1 {page:WordSection1;}, Estimated Processing Timeframe: 6 months for new minor source / 12 months for new major source Several of the forms are fill-in PDF files which enable an applicant to view a form on the computer screen, enter information using the cursor and keyboard, and then print a paper copy to mail or bring in. Anthony Karge, akarge@bcnnew.com. Site Plan prepared by Redniss and Mead, 2-21-23
At this time we encourage online Zoom meetings. Please enable JavaScript in your browser for a better user experience. #IWW-11662-22, PZ-22-00806, Subdivision 0 Maple Avenue North, Comments from Aspetuck Health District, 2-9-23, Clarification provided by the Town Attorney's Office, 2-9-23, Comments from Conservation Dept., 2-13-23, Comments from the Town Attorney's Office, 2-13-23, Text Amend. 6 months renewal modification. Zoning Data Chart Revised 2-21-23
Field Card
Illustrative Plan prepared by Landtech, 02-07-23
Records created in the current system start 2/1/2020. Certificate of Mailing
NOTE: Submitting an applications through the portal requires registration. XuzGH0z9:
-m:n_c=Suo{ Pse\1
D|xe=* {?Zu +5 Additional Information provided by P&Z Staff
Existing Survey
For more information or to schedule a Zoom meeting, call our office at203-341-5025. (, $8,000 total, including $800 initial fee with balance billed annually in $800 increments. Estimated Processing Timeframe: 6 months P&Z Staff Comments
Supplemental Explanatory Statement #2, 2-21-23 wATTS
History Chart 1-3-22
* & **. WESTPORT -- Honda of Westport, after cutting the number of service bays proposed at a new Fairfield service center by one-third, was back before the Town Plan and Zoning Commission on Tuesday. Ranging from $2,050 to $6,250. We are here to accommodate and move commercial and residential projects along as quickly as possible. Assessors Map
Official, 2-10-23
Comments from the Conservation Dept. We apologize for any inconvenience. #PZ-22-00668, SUPERSEDED Zoning Chart, Received 1-30-23, SUPERSEDED Zoning Data Chart, Rev. Apply for state hunting and fishing permits. Public Notice: 30-day Public Notice and Comment Period, Estimated Processing Timeframe: 3 months, Estimated Processing Timeframe: 3 months Trade Permit (Electrical, Plumbing, and HVAC) application submissions: Certificate of Mailing
Approved v Proposed Conditions, Sheet SKO.03, by Beinfield Architecture 2-22-23
#PZ-23-00058
Comments from Parks and Rec. Paul S. Greenberg - Email, 02-27-23
P&Z Staff Comments
(Registration Required.) Type of Permit: Individual; ezFile, Permitting Overviews: %%EOF
Douglas Lomonte
2 and 8 Post Road West, Request for P&Z Commission to Determine to determine the proposed renovation will have no impact to Historic Design or Flood Heights per 30-16
1 Burr Road - Special Permit/Site Plan Appl. 515 Post Road East, 2nd Floor, Westport CT 06880 Telephone: 203-341-5025 Facsimile: 203-341-5009 E-mail: buildingpermits@westportct.gov 2022 ACCOMODATIONS Residents and contractors can call or email our office during regular business hours at 203-341-5025 to address any questions or concerns. Remainder due varies based on wastewater category and volume discharged. Abutters Report
Zoning Location Survey for 10 & 12 Maple Ave N prepared by Landtech, 11-16-22
Kennedy Administration Building 5387 Mary Lake Road Waunakee, WI 53597 Phone: (608) 849-4372 Fax: (608) 849-9657 Town Directory Dept. #PZ-23-00045
Subdivision Site Plan by LANDTECH 2-13-23
Comments from the Police Dept. Feedback Print. County Building Permits In Westport Connecticut. 1/25/2023 font size. @font-face {font-family:"Cambria Math"; panose-1:2 4 5 3 5 4 6 3 2 4; mso-font-charset:0; mso-generic-font-family:roman; mso-font-pitch:variable; mso-font-signature:-536870145 1107305727 0 0 415 0;}@font-face {font-family:Calibri; panose-1:2 15 5 2 2 2 4 3 2 4; mso-font-charset:0; mso-generic-font-family:swiss; mso-font-pitch:variable; mso-font-signature:-536859905 -1073732485 9 0 511 0;}p.MsoNormal, li.MsoNormal, div.MsoNormal {mso-style-unhide:no; mso-style-qformat:yes; mso-style-parent:""; margin-top:0in; margin-right:0in; margin-bottom:10.0pt; margin-left:8.65pt; line-height:115%; mso-pagination:widow-orphan; font-size:12.0pt; font-family:"Calibri",sans-serif; mso-ascii-font-family:Calibri; mso-ascii-theme-font:minor-latin; mso-fareast-font-family:"Times New Roman"; mso-hansi-font-family:Calibri; mso-hansi-theme-font:minor-latin; mso-bidi-font-family:"Times New Roman";}.MsoChpDefault {mso-style-type:export-only; mso-default-props:yes; font-size:11.0pt; mso-ansi-font-size:11.0pt; mso-bidi-font-size:11.0pt; font-family:"Calibri",sans-serif; mso-ascii-font-family:Calibri; mso-ascii-theme-font:minor-latin; mso-fareast-font-family:Calibri; mso-fareast-theme-font:minor-latin; mso-hansi-font-family:Calibri; mso-hansi-theme-font:minor-latin; mso-bidi-font-family:Arial; mso-bidi-theme-font:minor-bidi;}.MsoPapDefault {mso-style-type:export-only; margin-bottom:8.0pt; line-height:107%;}div.WordSection1 {page:WordSection1;}, Estimated Processing Timeframe: Notification only. . Stay safe and enjoy the summer. Grading History Letter
Application Revised 02-28-23. Public Notice: Initial Notice of application - AND - Notice of Tentative Determination (45 days). Apply. Search result within the department display by default. A county building permit in Westport Connecticut may also need to be renewed every so often to prove that the building is still in good standing, and that all inspections have passed muster. Abutters List
10/24/22 Approval of Text Amend #823 Res. Background
Building Department Comments 2-7-23
Supply Chain/Logistics. The NYC law also permits certain qualified owners, including association boards, to add their building to OSE's "prohibited building list" to prevent any short-term rental of any dwelling unit therein. The maximum allowable cost per linear foot of garage foundation will go from $657 to $710. Fees: Varies by registration type. Comments from Bldg. Site Engineering Report prepared by Redniss & Mead, 01-06-23
Contractor License Look-up. Applicants Materials 02-14-23, *WITHDRAWN ITEMS & RECENT ACTED UPON ITEMS Will Appear Until the Appeal Period Ends*, GRANTED 2/27/23 -1595 Post Road East - Special Permit/Site Plan Appl. Please enable JavaScript in your browser for a better user experience. Positive 8-24 Report for Lease of Longshore Inn 12-21-06
Class A Truck Driver. Verify. If you are in need of this permit, you need to file an application for this permit from your local Department of Public Works. Superseded
Please bring 2 site If you are an existing user, please enter your user name and password in the box on the right. _Adopted 8-24 Procedures, Rev. Draft Action Minutes, 02-27-23, NEW BUSINESS
You can now check your inspection results online -westportct.gov go to the "searching bubble" and click on the link to our Online Services Portal. Fill out the Online Application and submit it. 3-2-23
Land Use Forms and Applications Financial assurance required. / XN
Perpetual Conservation Easement and Map
PLANNING AND ZONING COMMISSION 225 Center Road - Easton, Connecticut 06612 . Notice Letter, Supplemental, 3-2-23
65 Easton Rd. Letter from Steve Cavazuti 1-5-23
Municipal Improvement Application
2-21-23, Comments from Conservation Dept., 2-21-23, Comments from Aspetuck Health District, 2-27-23, Positive 8-24 Report for Lease of Longshore Inn 12-21-06, Summary and Copies of Prior Lease Amendments, received 3-2-23 from Atty. Building Permit Application Instructions for obtaining a Building Permit Electrical Application HVAC & Plumbing Application How to obtain a Generator & Propane Tank Permit Generator Permit Statement of Compliance for Generators Oil and Gas Tank Application Demolition Permit Application Notice of Procedures to All Owners and Contractors The Building Department is responsible for the following tasks: Free viewers are required for some of the attached documents.They can be downloaded by clicking on the icons below. Remainder due varies based on wastewater category and volume discharged. Comments from the Town Attorney's Office, 2-13-23
Comments from the Fire Marshal, 2-9-23
Municipal building inspection and permit department provides information for, and enforces, state building codes for new construction, rehabilitation, or alteration of commercial and residential buildings in the town of Westport. Permits for all work to be performed in the Town right-of-way including, but not limited to: Drain Connection, Driveway Installation, Shoulder Opening, Sidewalk Opening, Street Opening, and Use of Right-of-Way. Estimated Processing Timeframe: Filing with local POTW Field Card
Certificate of Mailing
Page and click on either the CO or Oil Tank link and search by address. Statement of Use and Narrative
Permit application a separate excavation & fill application will YES be required. List of Neighbors Notified
Resolution
#PZ-22-00771, Application
Building Department Comments, 01-23-23
Varies by registration type. Ranging from $2,050 to $6,250.
Required Grid A-2 Property Surveys. 5-9-22
Existing Survey prepared by Landtech, 11-04-22
A site plan showing location or proposed generator, septic and well location. 01-11-2023 WPCA APPROVED MINUTES
Several of the forms are fill-in PDF files which enable an applicant to view a form on the computer screen, enter information using the cursor and keyboard, and then print a paper copy to mail or bring in. Generators, Exterior Gas Line Installation Certification, Building Permit Requirements and Directions for Workers Compensation forms, Coverage Application for an employee who is an officer, form 6B, fill-in online, Building Permit-Workers Compensation, form 7A, fill-in online, Building Permit-Workers Compensation, form 7B, fill-in online, Building Permit-Workers Compensation, form 7C, fill-in online, Residential Smoke Alarm Test Certification, Certification for PV Power System Installation, Electric Vehicle Charging Station Installation Permit Application, Conservation Requirements for Plan Review, 2022 Commission Meeting Dates and Deadlines for Submission, (Schedule C) Wetlands/Watercourses Application, (Schedule D) Waterway Protection Lines Application, Application for Amendments to Wetland Boundary Maps, Cockenoe Island Camping Permit Application, Removal or Abandonment of Underground Storage Tanks, Certificate of Appropriateness - HDC CA Appl 2pgs 08-15-18, Historic Design District HDD Review Appl 2pgs 08-09-18, ARB-HDC Joint Committee HRS Review Appl 1pg 07-24-18, Special event Facility use Request Form - All three forms below in one form, Map Sign off-First Cut Division of land , Lot line Change, Lot determination, Map Sign off- No lot line change Application, Site Plan and Special Permit Application Packet, Subdivision and Resubdivision Application, Substantial Improvement Review Packet rev 01-08-21, Department Approvals needed for Residential Projects, Flood Map information: Vertical Datum Conversion, Residential Permits Issued by the Public Works Department, Print Petition For Parking Ticket Violations, Zero Tolerance Policy for Minors with Alcohol, Application for Driveway Permit with Details and Notes, Application for Road Opening Permit and Bond Requirement, Application for Sanitary Sewer Permit and Bond Requirements, Ice Cream Vendors and Peddlers Permit Procedure & Application, Use of Town-Owned Property, Facilities and/or Public Roadways Procedure & Application, Vendor Door-To-Door Procedure & Application. The Building Department processes permit applications and provides resources for consumers and contractors. Field Card
* APPLY AND MAKE ONLINE PAYMENTS FOR LAND USE PERMITS Apply for or review Zoning, Health, Conservation, Public Works, Building and Fire permits. Application
Regrading Plan prepared by Landtech, 02-24-23
Certificate of Mailing
#PZ-23-00041
Zoning History, Updated 3-1-23
(See How to Register video below for more information). Dept. hVyTS^6$,A@a"
!`d- FJ(Kp}0 a8 $75 for each new wharf, pier, ramp and float (requires pier permit application) + $100 if Planning Board review is required. 12 months new. $940 for modification. IN MOST CASES, APPLICATIONS MAY BE MADE To SEPARATE DEPARTMENTS SIMULTANEOUSLY. *, Apply for or review Zoning, Health, Conservation, Public Works, Building and Fire permits. Site Plan by B&B Engineering 12-7-22
Welcome to the Westport Online Service Portal We are pleased to offer our citizens, businesses, and visitors access to government services online, 24 hours a day, 7 days a week. 2-3-23, 10/24/22 Approval of Special Permit/Site Plan Application, Res. Contact Us. The Purpose of a Building Permit A building permit gives you, your insurance company, your neighbors and the town assurance that specific minimum standards are met in constructing, altering, or repairing your home by complying with the Building Code.
Aspetuck Health District Comments 2-13-23
Telephone: 203-341-5025
Staff Comments, 2-22-23
Public Notice:Initial Notice of application- AND -Notice of Tentative Determination (30 days). Official, 3-2-23
(19G!BQ3="a*?,4ox6{WD+QJE+QJ SUPERSEDEDIllustrative Plan Showing Exempted Grading by Landtech, Cut Fill Plan-C-1.0 A, 2-7-23
3 months for revision. Planting Plan prepared by William Kenny Associates, 01-10-23
Construction Management - Logistics Plan 02-13-23
Guide to Online Permits - Coming Soon
Comments from WPD, 2-10-23
Application Revised 02-28-23
Map Showing Neighbors Notified
Get More Detail. Notice Letter
Project Description
Fees: Local POTW may require their own fee. Authorization
EJ, if in applicable area. #IWW-11662-22
Letter of Authorization, ACTION MINUTE REVIEW
Abutters Map
Office of the CT State Building Official. @font-face {font-family:"Cambria Math"; panose-1:2 4 5 3 5 4 6 3 2 4; mso-font-charset:0; mso-generic-font-family:roman; mso-font-pitch:variable; mso-font-signature:-536870145 1107305727 0 0 415 0;}@font-face {font-family:Calibri; panose-1:2 15 5 2 2 2 4 3 2 4; mso-font-charset:0; mso-generic-font-family:swiss; mso-font-pitch:variable; mso-font-signature:-536859905 -1073732485 9 0 511 0;}p.MsoNormal, li.MsoNormal, div.MsoNormal {mso-style-unhide:no; mso-style-qformat:yes; mso-style-parent:""; margin-top:0in; margin-right:0in; margin-bottom:10.0pt; margin-left:8.65pt; line-height:115%; mso-pagination:widow-orphan; font-size:12.0pt; font-family:"Calibri",sans-serif; mso-ascii-font-family:Calibri; mso-ascii-theme-font:minor-latin; mso-fareast-font-family:"Times New Roman"; mso-hansi-font-family:Calibri; mso-hansi-theme-font:minor-latin; mso-bidi-font-family:"Times New Roman";}.MsoChpDefault {mso-style-type:export-only; mso-default-props:yes; font-size:11.0pt; mso-ansi-font-size:11.0pt; mso-bidi-font-size:11.0pt; font-family:"Calibri",sans-serif; mso-ascii-font-family:Calibri; mso-ascii-theme-font:minor-latin; mso-fareast-font-family:Calibri; mso-fareast-theme-font:minor-latin; mso-hansi-font-family:Calibri; mso-hansi-theme-font:minor-latin; mso-bidi-font-family:Arial; mso-bidi-theme-font:minor-bidi;}.MsoPapDefault {mso-style-type:export-only; margin-bottom:8.0pt; line-height:107%;}div.WordSection1 {page:WordSection1;}, Fees: $100, $300, or $700 depending on Statutory applicability.
Kevin Wilson Director,
The Word Nascar Is An Oxymoron,
Gulf Of Mexico Platform Coordinates,
Articles W